中文摘要: 铜坑矿92#矿体的直接顶板就是开采91#矿体时的胶结或者非胶结的空区充填体,并且尚存在未充填采空区45万多m3,使92#缓倾斜厚大矿体的上部形成大范围的隐患区,开采条件十分复杂,地压活动非常频繁。根据矿山实际建立了一套多通道岩体声发射监测系统(本文仅取其中的8个通道),对92#矿体的回采过程进行地压活动监测。本文在现场采集监测数据的基础上,对声发射事件数、波形等参数进行了分析,统计得出了铜坑矿92#矿体回采过程中采场应力场与声发射活动频度之间的相关关系。
Abstract:The direct roof of the 92# orebody in Tongkeng mine is the consolidated or non-consolidated goaf filling when mining the 91# orebody. Furthermore, over 450,000 m3 goaf are still unfilled forming a vast risk zone over the slowly inclined large and thick orebody, which leads to complex mining conditions and frequent geostatic activity. According to the actual situation of Tongken mine, a multi-channel AE monitoring system is established (this article only covers eight channels) in order to monitor the ground pressure in the 92# orebody mining. Based on the monitoring data, this paper analyzes parameters such as the number of AE events and wave, and strikes statistically the correlation between the stress field of mining the 92# orebody in Tongkeng mine and the acoustic emission activity frequency.
keywords: AE stoping microseisms pillar group
文章编号:201104005 中图分类号: 文献标志码:
基金项目:“十一五”国家科技支撑计划项目(2008BAB32B02-5)
作者 | 单位 |
袁本胜 | 北京矿冶研究总院,北京 100070 |
张银平 | 北京矿冶研究总院,北京 100070 |
黄道钦 | 广西华锡集团有限责任公司铜坑矿,广西柳州 547000 |
兰 虎 | 广西华锡集团有限责任公司铜坑矿,广西柳州 547000 |
史晓鹏 | 北京矿冶研究总院,北京 100070 |
引用文本:
袁本胜,张银平,黄道钦,兰 虎,史晓鹏.铜坑矿92#矿柱群回采过程中的声发射监测应用与分析[J].矿冶,2011,20(4):20~.
袁本胜,张银平,黄道钦,兰 虎,史晓鹏.铜坑矿92#矿柱群回采过程中的声发射监测应用与分析[J].矿冶,2011,20(4):20~.