小长冲河矿段顶板控制数值模拟研究
张明天1, 侯克鹏1, 孙伟1, 吴雅菡2, 牛向东1, 张盛友1
(1.昆明理工大学 国土资源工程学院 云南省中-德蓝色矿山与特殊地下空间开发利用重点实验室;2.昆明理工大学 国土资源工程学院)
Numerical simulation of roof control in Xiaochangchonghe ore section
Zhang Mingtian1, Hou Kepeng1, Sunwei1, Wu Yahan2, Niu Xiangdong1, Zhang Shengyou1
(1.Yunnan Key Laboratory of Sino-German Blue Mining and Utilization of Special Underground Space,School of Land and Resources Engineering;2.School of Land and Resources Engineering)
摘要
图/表
参考文献
相似文献
本文已被:浏览 50次   下载 13
投稿时间:2020-02-25    修订日期:2020-02-25
中文摘要: 金属矿床地下开采过程中,顶板控制直接影响到采场地压控制。针对小长冲河采场顶板不处理时,采空区的极限暴露面积比较小,随着矿体倾角的增大,顶板冒落范围也不断扩大,导致开采过程中矿石损失贫化严重。研究认为直接顶板铝土页岩是影响矿体开采的主要因素,通过对该矿段采场运用3D-σ有限元软件进行数值模拟分析,分别模拟研究了留点柱、锚杆护顶、留矿石护顶层三种不同的顶板控制方案,得出三种不同模拟方案下采场稳定性,综合模拟分析结果,最终提出采用留点柱、锚杆护顶、留矿石护顶层相结合的方法进行开采,该方案不仅有效控制了顶板冒落,而且相对于单独留点柱支撑顶板方案而言,能大大增加点柱之间矿块的距离(跨度从6~8m增加至14m左右),进而增加了采场暴露面积,达到减少矿石损失贫化的目的。
Abstract:In the process of underground mining of metal deposits, the roof control directly affects the ground pressure control of the stope. Aimed at the roof of xiaochangchonghe stope is not disposed, the limit exposure area of the goaf is small relatively,with the increase of the dip angle of the ore body, the roof caving boundary is also expanding, which leads to ore loss and dilution seriously in the mining process. Research suggests that direct roof bauxite shale is the main factor affecting ore body mining,3D-σ finite element software was used for numerical simulation analysis of the stope,three different roof control schemes are simulated and researched, including point retention column, anchor roof protection, and ore retention top layer,obtained stope stability under three different simulation scenarios,comprehensive simulation analysis results,finally, it is proposed to use a combination of retaining point pillars, anchoring roof protection, and retaining ore protection top layer for mining,this solution not only effectively controls the roof fall, but also can increase the distance greatly among the ore blocks between the points and pillars compared with the plan of supporting the roof with separate point pillars(span increased from 6 ~8m to about 14m),Furthermore, the exposed area of the stope has been increased to achieve the purpose of reducing the ore loss and dilution.
文章编号:     中图分类号:    文献标志码:
基金项目:国家自然科学基金项目(面上项目,重点项目,重大项目)
引用文本:
张明天,侯克鹏,孙伟,吴雅菡,牛向东,张盛友.小长冲河矿段顶板控制数值模拟研究[J].矿冶,2020,(4):.

为了给您提供更优质的网页浏览体验,请使用 Firefox 、Chrome、IE10、IE11、360极速模式、搜狗极速模式、QQ极速模式等浏览器,其他浏览器不建议使用

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
010-63299751

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299751

传真:010-63299754

QQ:XXXXXXX

Email:kuangye@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼905 北京矿冶研究总院《矿冶》编辑部

关注微信公众号