中文摘要: 为解决云南某铁矿深部软岩巷道支护结构整体失效所产生的巷道两帮破坏严重,底鼓等围岩变形破坏的问题,通过现场实地踏勘、地压监测数据、XRD衍射实验等分析造成1452 m分段部分巷道发生变形失稳的原因,通过理论计算得出塑性区半径和周边位移,理论分析各因素如何影响巷道失稳变形。基于正交实验法,利用FLAC3D数值模拟软件建立16个数值模型,以巷道顶底板、两帮位移、塑性区体积为判定依据,分析锚杆长度、锚杆间排距、喷层厚度对巷道围岩稳定的影响。提出“树脂锚杆+锚索+管缝式锚杆+混凝土喷射”联合支护方法,通过现场工业试验对现场试验段巷道进行位移监测,结果表明,该联合支护方法可以长期有效的控制1452 m分段破坏巷道围岩变形。
中文关键词: 软岩巷道、围岩失稳机理、塑性区理论、巷道支护
Abstract:In order to solve the problem of serious damage to the two gangs of the roadway and deformation and damage to the surrounding rock such as bottom drum caused by the overall failure of the roadway support structure of a deep soft rock roadway in an iron ore mine in Yunnan, we analyze the reasons for the deformation and destabilization of the part of the roadway in the section of 1452 m through the on-site field surveys, ground pressure monitoring data, and XRD diffraction experiments, etc., and derive the radius of the plastic zone and the peripheral displacement through theoretical calculations, and theoretically analyze how the various factors affect the roadway. Theoretically analyze how each factor affects the destabilizing deformation of the roadway. Based on the orthogonal experiment method, 16 numerical models were established by using FLAC3D numerical simulation software to analyze the influence of anchor length, row spacing between anchors and spray layer thickness on the stability of the surrounding rock of the roadway based on the determination of the top and bottom plates of the roadway, the displacements of the two gangs, and the volume of the plastic zone. The joint support method of "resin anchor + anchor cable + pipe slit anchor + concrete spraying" is proposed, and the displacement monitoring of the roadway in the field test section is carried out through on-site industrial test, and the results show that the joint support method can effectively control the deformation of the peripheral rock of the roadway in the 1452 m segmental damage in the long term.
keywords: soft rock roadway surrounding rock instability mechanism plasticity district theory road crowning lining
文章编号:20240305004 中图分类号:TD32 文献标志码:
基金项目:国家自然科学基金(U1602232)
引用文本:
安南,陈俊智,任春芳,杨立新,魏行,陈祯.云南某铁矿软岩巷道失稳机理与支护技术研究[J].矿冶,2025,34(1):.
安南,陈俊智,任春芳,杨立新,魏行,陈祯.云南某铁矿软岩巷道失稳机理与支护技术研究[J].矿冶,2025,34(1):.