| Volume 26,Issue 2,2017 Table of Contents
mining & mineral processing | | | In-situ Direct Shear Test Study of Quartz-Mica Schist for East Slope of Manjiazhai | | Wei Jiaxiao and Hou Kepeng | | Published April 25, 2017 (5 pages) | | 2017,26(2):1-5 [Abstract] [View PDF] | | | | Experimental study on mineral processing of the Dsmingcao copper deposit | | yang ji qing | | Published April 25, 2017 (9 pages) | | 2017,26(2):6-11 [Abstract] [View PDF] | | | | Application of a new sulfurizing reagent ZY in Floatation of Oxide Copper Ore | | ZENG Mao qing,YE Jia sun,SHAN Yong,ZHAO Pei liang and LE Zhi guang | | Published April 25, 2017 (10 pages) | | 2017,26(2):12-16 [Abstract] [View PDF] | | | | Research on Flotation of a Fluorspar-barite Ore in Yunnan | | Li Fei,Liu Dianwen,Zhang Xiaolin,Li Jianmin,Yan Shoukai,Shen Peilun,Song Kaiwei,Xu Xiaohui and Han Yuguang | | Published April 25, 2017 (7 pages) | | 2017,26(2):17-22 [Abstract] [View PDF] | | | | Improvement in Mining Process for Gently Inclined Unstable Thick Ore Body | | XU Yanqiu and HUANG Yi | | Published April 25, 2017 (7 pages) | | 2017,26(2):23-25 [Abstract] [View PDF] | | | | Study on Beneficiation Process of a Refractory Tin-Copper Polymetallic Ore in Yunnan | | CHEN Jun and WU Jie | | Published April 25, 2017 (9 pages) | | 2017,26(2):26-30 [Abstract] [View PDF] | | | | Grey state strategic decision method and its application in productive schedule planning of Shizishan copper deposit | | Zhang Wupeng | | Published April 25, 2017 (8 pages) | | 2017,26(2):31-36 [Abstract] [View PDF] | | | | Research of Model Experiment in Layered Rock Mass of Undergroup Mining | | XIE Jin-yi,HOU Ke-peng and JIANG Jun | | Published April 25, 2017 (5 pages) | | 2017,26(2):37-40 [Abstract] [View PDF] | | |
metallurgy & material | | | Investigation on combustion conditions of coal injection into blast furnace by petrographical microanalysis of dustXINGTAI IRON STEEL CORP.,LTD | | Ma Baoliang,Zhang Yuzhu,Xu Ying and Cai Yanqing | | Published April 25, 2017 (8 pages) | | 2017,26(2):41-45 [Abstract] [View PDF] | | | | Research on FeO contentof sinter in Hebei Tangsteel Group Co. LTD | | Huang Wei-qing,HU Qi-chen,HU Bin-sheng and WANG Na | | Published April 25, 2017 (6 pages) | | 2017,26(2):46-51 [Abstract] [View PDF] | | | | Advance research of flue gas desulfurization with red mud in alumina plant | | zuo xiaolin,LI BIN,HU XUEWEI,ZHANG BAOHUA and huang jianhong | | Published April 25, 2017 (6 pages) | | 2017,26(2):52-55 [Abstract] [View PDF] | | | | The Practice and Retrofit optimization of the gold concentrate Roasting System | | Wang Wei-zhen,Chang Yao-chao and Wang Yun | | Published April 25, 2017 (5 pages) | | 2017,26(2):56-58 [Abstract] [View PDF] | | | | The status of removal zinc in Bayer process of alumina production | | Li Junfu,Shi Yingjie,Li Rongxing,YU Xiaohua,Zhang Tao,Xie Gang and Qiao Juqi | | Published April 25, 2017 (6 pages) | | 2017,26(2):59-63 [Abstract] [View PDF] | | |
equipment & automation environment & renewable resource process mineralogy & instrumental analysis
|