| SELECTION OF HOISTING AND INSTALLING SCHEME FOR RISING THE ROOF OF LARGE PLANT BUILDING AND CONSTRUCTING TECHNOLOGY |
|
Revised:July 25, 2000
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:Roof rising,Hoisting and installing,Gantry crane, |
|
|
| Hits: 2639 |
| Download times: 31 |
| Abstract: |
| The Leaf Filtration is an important stage in production of aluminum oxide at Zhengzhou Aluminum Plant. Because of production requirement, the roof of plant building must be risen. In the light of structural features of the building and actual site conditions, a scheme of using a gantry crane for rising and installing the roof of the building was adopted. Based on strict management and construction, this difficult project has been completed smoothly, which enriches the constructing experience in rise of the roof of large plant building. |