|
| ESTABLISHMENT OF PRODUCTIVE BLASTHOLE MODEL AND ITS APPLICATION IN AN OPEN PIT |
|
Revised:August 13, 2000
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:Blasthole model,Short term plan,Ore control,Geostatistics,Open pit, |
|
|
| Hits: 4066 |
| Download times: 88 |
| Abstract: |
| The collection and management of the productive blasthole data and present topography data in an open pit are presented in this paper. The procedure of using Mintec software to establish blasthole model is also described. The application of the blasthole model in some aspects such as short term plan, ore control, modification of production plan and production control are summarized. Finally, some author's views are given. |
| Close |
|
|
|