|
| SELECTION OF TRANSPORT SYSTEM IN PLAN OF TECHNOLOGICAL TRANSFORMATION OF KAOLIN OPENCUT |
|
Revised:December 04, 2002
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:Opencut,Mine haulage,Motor haulage,Belt conveyor,Technological transformation, |
|
|
| Hits: 2055 |
| Download times: 23 |
| Abstract: |
| This paper deals with original schemes of ore and rock haulage,existing production situation and the problems necessary to be solved in plan of technological transformation in Longyan Kaolin Co.On basis of (actual) conditions in kaolin opencut,the feasible schemes of ore and rock haulage are recommended and their advantages and shortages are expounded.At the same time,the feasible ore and rock haulage systems are,in detail,compared in respects of technological process,land requisition,capital investment,operation cost,etc.Ultimately,the truck-belt conveyor haulage and the motor haulage are decided as optimal schemes of ore and rock haulage respectively. |
| Close |
|
|
|