|
| COMPREHENSIVE APPLICATION OF HORIZONTAL-HOLE SPRINGING BLASTING AND SHEAR-HOLE SPRINGING BLASTING |
|
Received:March 28, 2005
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:Rock excavation; Springing blasting; Horizontal hole; Shear hole |
|
|
| Hits: 2698 |
| Download times: 21 |
| Abstract: |
| In excavation of steep rock, a method of combining horizontal-hole springing blasting and shearhole springing is used, so as to reach a fastened construction schedule, a reduced blasting costs as well as a safety operation in terms of the control of the slope height in reasonable level. The difference of hole springing, hole loading and applicable condition are given by contrasting horizontal-hole springing blasting with shear-hole springing blasting. |
| Close |
|
|
|