STUDY ON TECHNOLOGY OF THE FAST PILING RED MUD DAM
Received:March 08, 2006            
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:red mud damming ; fast solidified ; civil gridiron ; dam stabilization
1. Beijing General Research Institute of Mining and Metallurgy, BeijinglO0044, China ; 2. Shandong Branch of China Aluminum industry, Zibuo 255052, Shangdong, China
Hits: 2043
Download times: 19
Abstract:
      Shandong aluminum industry company second red mud dam usually takes place breaking down because piled time of the red mud is too short to solidify. This paper introduces fast damming technology with the civil gridiron and with the limestone or gypsum and agent and thin plastics so that dam is steady on the condition that damming speed is 10m/a and that liquid-to-solid ratio is 5.