| NUMERICAL SIMULATION OF ANCHORING AND GROUTING TO BROKEN PILLARS IN TONGKENG MINE |
|
Received:April 02, 2011
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1005-7854.2011.03.003 |
| KeyWord:anchoring and grouting reinforcement;3D numerical simulation;stability analysis |
| Author | Institution |
| QIN Xiu-shan |
Beijing General Research Institute of Mining & Metallurgy, Beijing , China |
| CHEN He |
Beijing General Research Institute of Mining & Metallurgy, Beijing , China |
|
| Hits: 2560 |
| Download times: 74 |
| Abstract: |
| In order to verify the effect of anchoring and grouting reinforcement to broken pillars in Tongkeng mine, the reinforcement process is analyzed by numerical simulation with FLAC3D numerical analysis software. It was shown that the plastic region and displacement of surrounding rock obviously decreased after anchoring and grouting . Pillars stability can be significantly improved by the reinforcement of anchoring and grouting. |