NUMERICAL SIMULATION OF ANCHORING AND GROUTING TO BROKEN PILLARS IN TONGKENG MINE
Received:April 02, 2011            
View Full Text  View/Add Comment  Download reader
DOI:10.3969/j.issn.1005-7854.2011.03.003
KeyWord:anchoring and grouting reinforcement;3D numerical simulation;stability analysis
     
AuthorInstitution
QIN Xiu-shan Beijing General Research Institute of Mining & Metallurgy, Beijing , China
CHEN He Beijing General Research Institute of Mining & Metallurgy, Beijing , China
Hits: 2560
Download times: 74
Abstract:
      In order to verify the effect of anchoring and grouting reinforcement to broken pillars in Tongkeng mine, the reinforcement process is analyzed by numerical simulation with FLAC3D numerical analysis software. It was shown that the plastic region and displacement of surrounding rock obviously decreased after anchoring and grouting . Pillars stability can be significantly improved by the reinforcement of anchoring and grouting.