The Numerical Simulation of Tailing Filling for Potash Mines
Received:January 30, 2012   Revised:March 21, 2013   Accepted:February 16, 2012      Published Online:May 16, 2013
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:potash mine, Magnesium Cement, Tailing filling, numerical simulation
     
AuthorInstitution
LiYufeng Beijing General Research Institute of Mining Metallurgy,Beijing
LiGuozheng China Enfi Nonferrous Engineering Co Ltd
Hits: 2755
Download times: 12
Abstract:
      The tailing of potash is the biggest contamination in potash mines. Stacking the waste for a long time poses a potential threat to the environment. Filling the gob with potash tailing can not only solve the environmental problems of stacking the potash tailing, but also improve the recovery of potash and the safety of mining. This paper use the condensing effect between magnesium cement and potash tailing. The stress variation and wall rock deformation caused by filling body of different proportions are simulated by FLAC3D.The numerical simulation result can be reference by similar mines.
Close