|
| Experimental Study on Influence of Process Factors upon Desilication Rate of the High-phosphorus Hot Metal |
|
Received:December 16, 2012
Revised:September 12, 2013
Accepted:December 18, 2012
Published Online:December 21, 2013
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:high-phosphorus iron ore; desilication; process factors; hot metal pretreatment |
| Author | Institution |
| Xiong Wei |
Key Laboratory for Ferrous Metallurgy and Resources Utilization of Ministry of Education,Wuhan University of Science and Technology |
| Wang Jie |
Key Laboratory for Ferrous Metallurgy and Resources Utilization of Ministry of Education,Wuhan University of Science and Technology |
| Yang Fu |
Key Laboratory for Ferrous Metallurgy and Resources Utilization of Ministry of Education,Wuhan University of Science and Technology |
|
| Hits: 2815 |
| Download times: 14 |
| Abstract: |
| In order to promote the rational utilization of high-phosphorus iron ore in western Hubei of China, the effect of process parameters on desilication rate of the high-phosphorus hot metal was investigated. The results show that with the increasing of desiliconization agent addition, the desilication rate increases slightly. The oxygen efficiency is over 50% when desilication agent addition is about 30kg/t.The slag basicity affects the desilication rate simultaneously with the excess coefficient of FeO, and higher desilication rate could be achieved when the proportion between oxidant and lime is appropriate. Desilication rate is higher when the stirring gas flow was about 0.4l/min and the desilication reaction temperature is about 1400℃. Strengthening stirring of bath at the beginning period can improve kinetics condition of desilication reaction. |
| Close |