Scheme optimization of residual pillars recovery based on AHP and fuzzy decision
Received:April 18, 2013   Revised:February 13, 2014   Accepted:April 19, 2013      Published Online:March 24, 2014
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:pillar extraction; analytic hierarchy process; fuzzy decision; scheme optimization
           
AuthorInstitution
YU Genbo School of Civil and Environmental Engineering,University of Science and Technology Beijing
YANG Peng Beijing Key Laboratory of Information Service Engineering Beijing Union University,Beijing
LV Wensheng School of Civil and Environmental Engineering,University of Science and Technology Beijing
CHEN Zancheng Beijing General Research Institute of Mining and Metallurgy
Hits: 3222
Download times: 37
Abstract:
      Based on geological condition of the goaf in Pinglidian gold mine, four kinds of residual pillars recovery mining method are chosen for comprehensive evaluation. Choosing the nine main influencing factors from technical economy and the residual ore extraction safety, the index system of comprehensive evaluation is established. Using the analytic hierarchy process, the judgment matrix among the various levels and weight matrix of different influence factors are obtained. The mathematics model of scheme optimization is built based on fuzzy decision theory, and the optimal proposal is determined according to the maximum membership grade principle. Practice shows that the integration project of full fill pillar recovery and cavity processing has the characteristics of safety and efficiency, it is worth popularization and application.
Close