|
| Equipment selction and caculation of leaching solution conveying system in heap leaching |
|
Received:March 10, 2014
Revised:March 14, 2014
Accepted:March 18, 2014
Published Online:April 20, 2015
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:long-distance pipeline;economic accounting; equipment costs;operating costs;optimum diameter |
| Author | Institution |
| HUANG Sheng |
Beijing General Research Institute of Mining and Metallurgy |
| WEI Bang |
Beijing General Research Institute of Mining and Metallurgy |
| ZHANG Lei |
Beijing General Research Institute of Mining and Metallurgy |
| JIANG Ying-ping |
Beijing General Research Institute of Mining and Metallurgy |
|
| Hits: 3756 |
| Download times: 2406 |
| Abstract: |
| This paper mainly introduces equipment selction and caculation of leaching solution conveying system in heap leaching. Firstly a series of pipes can be selected to caculate the pump parameters and check the pipeline pressure. Secondly we can caculate the equipment costs and operating costs and count up the total costs. Finally determin the optimum diameter and the pump parameters. |
| Close |