|
| Study on the Industrial practice of improving the gradeof Ge in Replacement Slag |
|
Received:September 11, 2017
Revised:September 24, 2017
Accepted:September 25, 2017
Published Online:May 25, 2018
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:Replacement;Slag The;grade of;Ge Industrial;application Process;reformation |
| Author | Institution |
| hu dong feng |
ZHONGJIN LINGNAN DANXIA COMPANY SMELTER |
|
| Hits: 1805 |
| Download times: 1213 |
| Abstract: |
| In the industrial process of enrichment and separation of Ga and Ge from pressure leaching: the grade of Ge in enrichment fluctuates greatly; the grade of Ge in neutralization residue is high and restricts the efficient recovery severely. In this article, the technical system and equipment optimization were analyzed systematically and discussed in combination with the problem that met in production practice in Danxia Smelter, it has also provided guidance for Danxia smelter to achieve optimized production in Ge enrichment and separation industrial process. |
| Close |