|
| Technical and economic analysis on the prevention and control of wastewater pollution in lead smelting enterprises |
|
Received:March 15, 2018
Revised:March 15, 2018
Accepted:March 20, 2018
Published Online:April 16, 2019
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:lead smelting; wastewater;prevention and control;technical and economic analysis |
| Author | Institution |
| chu zheng |
bgrimm technology group |
|
| Hits: 1722 |
| Download times: 1 |
| Abstract: |
| The status of wastewater pollution prevention and control project in typical lead smelting enterprises is investigated through on-site investigation, discussion, questionnaires and expert consultation. The research results show that the construction cost of waste acid treatment facilities is about 8500~12270 yuan / T D, the running cost is about 21.5~36.8 yuan /t, the construction cost of acidic wastewater treatment facilities is about 5000~5800 yuan / T D, and the running cost is about 3.7~5.7 yuan /t. The cost of waste acid treatment in wastewater treatment of lead smelting enterprises is much larger than that of acidic wastewater. The construction cost is about 1.5~2 times of acid wastewater treatment, and the running cost is about 4~6 times of that of acid wastewater. The main reason is related to the concentration of acid and pollutant. |
| Close |
|
|
|