Study on safe mining scheme of shallow buried large and residual ore body
Received:May 02, 2018   Revised:May 17, 2018   Accepted:May 18, 2018      Published Online:June 26, 2019
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:Shallow;buried, Empty;field method, Numerical;simulation, Thick;ore body
     
AuthorInstitution
JIAO Mandai Northwest Institute of Mining and Metallurgy,Baiying,Gansu
LIU Tao Northwest Institute of Mining and Metallurgy,Baiying,Gansu
Hits: 2631
Download times: 1522
Abstract:
      In order to safely and effectively recover the large residual shallow ore body, the RMR score of ore rock and surrounding rock is investigated through the investigation and quality evaluation of the rock mass in the ore body area. Rock mechanics tests were carried out on the main rock mechanics parameters. According to the spatial characteristics of residual orebodies, through the program technology and economic comparison, it is determined that the vertical pillar pillars method is adopted as the mining scheme. The simulation results show that the maximum displacement at the top of the mined bar is 2.36cm after the end of mining, and the sequence of the recovery of the two pillars is simulated and compared with the simulation results to finalize After the pillars were recovered, the maximum displacement in Z direction of the roof of the empty area reached 3.9cm.