Engineering Deisgn on Mo Mine Crushing System Upgrading and Production Practice
Received:May 14, 2018   Revised:November 07, 2018   Accepted:May 30, 2018      Published Online:January 11, 2019
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:crushing;system, upgrading, expansion, High;Pressure Grinding;Roll
  
AuthorInstitution
LIU Yuebing BGRIMM Technology Group
Hits: 1957
Download times: 1286
Abstract:
      The Thesis introduced engineering design on crushing system upgrading and production practice of certain Mo Mine. HPGR system has been selected through site investigation and operational practice of similar mines. Meanwhile, flexibility of the crushing system during overhaul of HPGR has been considered as well. Concentrator capacity before upgrading is 14,400 t/d, and the capacity will increase to 24,000 t/d after upgrading.The process flow is rational and sizing of equipment appropriate,industrial production standards are obtained successfully after the implementation.