Selection of transportation technology scheme for large - scale deep - cut open pit mine
Received:November 07, 2018   Revised:November 21, 2018   Accepted:November 27, 2018      Published Online:December 24, 2019
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:Open mining; Semi-continuous development process; Adhesive tape; Crushing station; investment
     
AuthorInstitution
chenfeng Kunming university of science and technology
yangyi Kunming university of science and technology
Hits: 1817
Download times: 946
Abstract:
      In the open pit mining, the transportation cost of ore takes a large proportion in the mining cost, especially with the extension of the open pit mining depth, the performance is particularly obvious. Therefore, the selection of efficient and low-cost ore transportation mode is very important. Combining with the concrete engineering practice in open-pit mine overseas, list four ore transportation scheme, from the perspective of economic, technology, engineering geology, hydrogeology, production operation and maintenance management, the level and the difficulty of construction, the construction time limit for a project, but also the practical for the solution and the comparison of the scheme from the aspects such as reliability, eventually recommend the mine ore transportation solutions to choose 2, namely half mobile crushing station + surface adhesive tape.