| Selection of transportation technology scheme for large - scale deep - cut open pit mine |
|
Received:November 07, 2018
Revised:November 21, 2018
Accepted:November 27, 2018
Published Online:December 24, 2019
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:Open mining; Semi-continuous development process; Adhesive tape; Crushing station; investment |
| Author | Institution |
| chenfeng |
Kunming university of science and technology |
| yangyi |
Kunming university of science and technology |
|
| Hits: 1817 |
| Download times: 946 |
| Abstract: |
| In the open pit mining, the transportation cost of ore takes a large proportion in the mining cost, especially with the extension of the open pit mining depth, the performance is particularly obvious. Therefore, the selection of efficient and low-cost ore transportation mode is very important. Combining with the concrete engineering practice in open-pit mine overseas, list four ore transportation scheme, from the perspective of economic, technology, engineering geology, hydrogeology, production operation and maintenance management, the level and the difficulty of construction, the construction time limit for a project, but also the practical for the solution and the comparison of the scheme from the aspects such as reliability, eventually recommend the mine ore transportation solutions to choose 2, namely half mobile crushing station + surface adhesive tape. |