|
| A New Method For Measuring Layout Design Of Open-pit Shovel Loading Line |
|
Received:March 27, 2019
Revised:April 21, 2019
Accepted:April 24, 2019
Published Online:June 26, 2019
|
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:open-pit mining ; Miming Shovel loading line;Line calibration; |
| Author | Institution |
| zhanghaitao |
China Gold Inner Mongolia Mining Co., Ltd. |
| wangli |
China Gold Inner Mongolia Mining Co., Ltd. |
| wangliang |
China Gold Inner Mongolia Mining Co., Ltd. |
|
| Hits: 2205 |
| Download times: 1570 |
| Abstract: |
| This article tells the story of the open-pit mine production process due to the diversity of orebody and its changes, cause the emergence of the inevitable mixed phenomenon, in view of the situation, the method of blasting dispersion law research and analysis, has realized the line entity ore-bearing lofting to dispersion, from mining design to measure lofting shovel loading line, put forward on the basis of principle, to improve fills in open-pit mine shovel loading line lofting a technology gap. |
| Close |
|
|
|