Experimental on Extraction of Copper from Lead Matte by Oxygen Pressure Acid Leaching
Received:June 14, 2021   Revised:November 03, 2021   Accepted:November 09, 2021      Published Online:October 25, 2022
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:lead matte; pressure acid leaching; particle size; two-stage leaching
        
AuthorInstitution
Zhongbiao Zhai State Key Laboratory of Pressure Hydrometallurgical Technology of Associated Nonferrous Metal Resources,Kunming Metallurgical Research Intitute
Mou Xingbing Kunming Metallurgical Research Institute Company Limited
Liu Junchang Kunming Metallurgical Research Institute Company Limited
Hits: 1550
Download times: 965
Abstract:
      The experimental study of oxygen pressure acid leaching lead matte was described in this paper. Various factors affecting the copper leaching rate were investigated. The optimal conditions for one-stage oxygen pressure acid leaching treatment of lead matte were: the particle size of lead matte was -45 μm, the initial mass of sulfuric acid was 150.00 g, the reaction temperature was 100 oC, the leaching time was 150 min, and the oxygen pressure was 1.0 MPa, the liquid-solid ratio was 3.0:1; the leaching rate of copper in the lead matte could reach more than 98%. The two-stage oxygen pressure acid leaching test of lead matte showed that this method could not only increase the leaching rate of copper, but also reduced the impurity content in the leaching solution. Lead and sulfur were concentrated in the leaching residue, realizing the comprehensive utilization of lead matte resources.