Study on structural parameter optimization of cutting the top in deep mining
Received:June 19, 2021   Revised:June 22, 2021   Accepted:June 23, 2021      Published Online:April 27, 2022
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:Bench open stoping; Drilling chamber; Pillar; Structural parameters; Numerical analysis
              
AuthorInstitution
TianMeng Kunming University of Science and Technology
LiGuangtao Kunming University of Science and Technology
ZhangXi yuxikuangyeyouxiangongsi
WangJun Kunming University of Science and Technology
YangTianyu Kunming University of Science and Technology
Hits: 1591
Download times: 985
Abstract:
      In the deep high stage open stope with subsequent filling in Dahongshan Copper Mine, this paper takes the stability of rock cutting and drilling chambers at the top of stope as the research object, and preliminarily determines the reasonable structural dimensions of chambers and pillars by using the area load theory of pillars, and analyzes the stability of the designed structural parameters by using FLAC3D.The results show that the width of the column should be designed as 4.5m when the width of the roof cutting and drilling chamber is 3.5m. The arrangement of simultaneous cutting groove and roof cutting coupling has a great influence on the stability of the drilling chamber. It is suggested to arrange the cutting groove at the end of the length direction of the chamber and the roof cutting coupling at the end of the width direction of the chamber. The roof cutting and rock drilling chamber designed according to the research results in Dahongshan copper mine can meet the requirements of safe operation in the process of service room mining.