Study on optimization of lean management system in whole process of EPC project general contracting
Received:October 27, 2023   Revised:October 27, 2023   Accepted:October 30, 2023      Published Online:March 24, 2025
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:general contract; whole process; lean management; system; optimization.
  
AuthorInstitution
Ren Hong-gang Beijing General Research Institute of Mining & Metallurgy Technology Group
Hits: 555
Download times: 242
Abstract:
      According to the characteristics of EPC project general contracting management, such as wide coverage stage, multiple interfaces, systematic and fine management is not strong, the lean construction theory is introduced to construct the "34521" management system architecture for engineering general contracting. Through optimizing the management structure of EPC project, the whole process of lean management and total factor management structure of EPC project are clarified. Based on the "Five modernizations" lean management methodology, it promotes the construction of lean management system for project general contracting from five aspects: management process, management form, management regime, management operation and management behavior, aiming at improving the efficiency, systematization, standardization, visualization and standardization of project management, the research results provide a systematic reference for relevant institutions to carry out EPC project management.
Close